Factory & technique

Where earthbecomes architecture

A state-of-the-art facility designed to transform raw volcanic basalt into premium construction materials at industrial scale.

Basalt factory tour

Situated in the heart of Saudi Arabia

Our factory is strategically located within the Kingdom of Saudi Arabia, positioned for optimal access to the Arabian Shield's rich basalt deposits and proximity to major construction markets across the GCC.

Saudi Arabia — exact site TBD
Arabian Shield basalt reserves nearby
Direct highway access to major cities
Export access via Red Sea / Arabian Gulf ports
Kingdom of Saudi Arabia
Factory location — TBD 2026

From rock to product

A six-stage precision manufacturing process — from raw stone extraction to certified product dispatch.

01

Raw basalt extraction

High-purity basalt rock is sourced from certified quarries across the Arabian Shield — one of the world's richest basalt reserves.

02

Crushing & sorting

Rock is crushed to precise sizes using jaw and cone crushers, then sorted by grade through vibrating screens and AI-assisted quality control.

03

Melting & fiberization

Sorted basalt is melted at 1,400–1,500°C in electric furnaces. The molten rock is drawn through platinum-rhodium bushings to form continuous fibers.

04

Fiber processing

Continuous fibers are wound, chopped, or woven into various forms — rovings, mats, meshes — depending on the target product.

05

Product manufacturing

Fibers are combined with resins, formed into bars, panels, or meshes using pultrusion, compression molding, or wet lay-up processes.

06

Quality testing & dispatch

Every batch undergoes tensile, thermal, and chemical resistance testing against international standards before certification and dispatch.

Equipment & technology

Our facility will be equipped with industry-leading European and Asian machinery, combining proven technology with cutting-edge automation.

Electric melting furnace
2 × 500 kW capacity
Fiberization bushing lines
400 filament platinum-rhodium
Pultrusion lines
3 × automated BFRP bar lines
Aggregate crushing plant
150 TPH jaw + cone crusher system
Quality lab
ISO 17025 accredited testing facility
Environmental control
Closed-loop emission filtration

Planned annual capacity

50,000+
Tonnes/year
Crushed aggregates
500
Tonnes/year
Basalt fiber products
200+
Employees
At full operation
Target capacity subject to Phase 2 expansion (2030–2032)

Built green from day one

Environmental responsibility is designed into every aspect of our factory — from site selection to production processes and waste management.

Zero liquid discharge

Full water recycling system within the factory

Air quality

NCEC-compliant filtration on all production exhausts

Waste reduction

95%+ material utilization — near-zero production waste

Energy efficiency

Renewable energy target: 40% solar-powered by 2030

Saudi Green Initiative

Basalt is proud to align with Saudi Arabia's net-zero targets and the National Environmental Strategy. Our manufacturing process produces 60% fewer CO₂ emissions than equivalent steel production.